Most people imagine the roof day as noise, dust and strangers tramping through the house from eight in the morning. Some of that is true. But a good crew works to a pattern, and once you know the pattern the day is a lot less stressful.
Before anyone arrives
The night before matters more than the day itself. The fitters need the room empty and a clear way in, and every minute they spend moving your furniture is a minute not spent on the roof.
- Empty the conservatory: furniture, plants, rugs and anything on the window sills.
- Clear the route: side gate unlocked, bins moved, and a path through the house if there is no other way to the back garden.
- Think about parking: a van and a skip or trailer need space near the front.
- Pets and children: keep them away from the work area all day.
It also helps to tell your neighbours, especially on a terrace where materials may be carried past their windows. If you live in The Park, which is a private estate with its own estate company, check whether the estate needs telling or has rules about works, as well as the council.
Morning: the old roof comes off
The crew usually starts by covering the floor and the inside of the frames, then takes off the old roof from the top down. Sheets or glass units come out first, then the glazing bars, and then the old ridge.
Once the frame is bare, a good fitter checks the top of the walls and the window frames before loading anything new onto them. LABC explains that with a tiled roof, the inspector checks that the old frames, the posts beside the doors and the base will bear the heavier load. If something looks wrong at this stage, this is when you will hear about it.
What the rest of the job looks like
The order of work depends a lot on the roof you chose. A glass or polycarbonate roof reuses or replaces the roof frame and is far quicker. An insulated tiled roof is closer to a mini extension, and the work stretches across several days.
| Stage | Glass or polycarbonate | Tiled warm roof |
|---|---|---|
| Old roof off | Yes | Yes |
| Frame work | Fix or replace the roof frame | Fit a structural frame around the top of the walls, then rafters |
| Making it weathertight | New units or sheets fitted and sealed | Boards and a membrane, then insulation, battens and tiles |
| Gutters | Usually new, fitted with the roof | New eaves gutters and downpipes |
| Inside | Trims and seals | Plasterboard, skim and any lights |
| Inspections | Usually none, if it stays a conservatory | Building control may visit at key stages |
The important part for you is that the roof is weathertight before the crew leaves each evening. Ask about it on the first morning if it is not clear.
When inspectors come
For a tiled roof, someone will have applied for building regulations approval. On a building notice, 48 hours is the wait between submitting and starting; there are no drawings to approve, so the surveyor judges it all on site. With full plans, the drawings were approved first and inspections follow.
Either way, you may see an inspector during the job. They are looking at the structure and the insulation before it is covered up, so do not be surprised if the crew waits for them before closing a section. In Nottingham the inspector comes from the city council’s building control service or from a registered approver. Our Nottingham regulations guide has the detail.
At the end of the job
Before the crew leaves for the last time, walk round with them.
- Outside: run your eye along the gutters and downpipes, and the lead or trim sealing the joint against the house wall.
- Inside: check the ceiling, the trims and that doors and windows still open properly.
- Paperwork: ask about the guarantee, the product warranty and, for a solid roof, the completion certificate.
Fresh plaster needs time to dry before you paint it, so do not rush the decorating.
Same lean-to, two different weeks
Take a small lean-to with old polycarbonate sheets, being replaced with glass units. The crew empties nothing because the owner already has, strips the sheets by mid-morning, finds the roof frame sound, and fits and seals the new units in the afternoon. There is no building control visit.
Now the same lean-to with a tiled warm roof instead. Day one ends with a new frame and a weathertight membrane. Tiles and gutters follow, plastering comes later, and an inspector calls once along the way. Same room, very different week.
For guide prices for both, see the Nottingham cost guide. Our main guide to conservatory roof replacement Nottingham pulls the whole subject together.